Sunday, April 28, 2024
Call us now:
(866) 246-1828
Model 800 Hydrostatic Sewer Cleaner

Model 800 Hydrostatic Sewer Cleaner

 

Professionally engineered to clean 4" - 24" diameter pipelines

The Model 800 Hydrostatic Sewer Cleaner... The Infinitely Variable Drive Speed System

  • Convenient hand lever for infinitely variable cleaning speeds at full torque from 50 to 1,000 RPM. 
  • Removable handle for compact storage and transport. 
  • 8 HP gasoline engine (9 HP diesel optional) provides more horsepower than any comparable model. 
  • Safety hydraulic relief valve for cable change operation. 
  • Ball bearing steel wheels with 12" pneumatic tires for easy manuevering. 
  • Hydraulic oil tank gauge. 
  • Rugged steel base with five gallon (19L) capacity hydraulic oil tank and baffled hydraulic oil cooler. 
  • Convenient vented hydraulic oil tank fill. 
  • Safety clutch for cable overload protection. 
  • Hydraulic pump passes up to 13 GPM. Pump/motor life span of up to 45,000 hours. 
  • JIC hydraulic fittings of aircraft design. 
  • High pressure hose rated up to 3000 PSI. 
  • 1.5 Gal. (5.7L) capacity fuel tank. 
  • Self-feeding, 1 1/4-inch (32mm) diameter municipal cable requires no handling by the operator and allows for faster cleaning. 
  • Right hand wound outer coils and 11/16" (16mm) diameter left hand wound inner coil, both anchored to the coupling, reduce helixing and loss of cable in pipeline, open space outer coil design helps loosen deposits and auger them back.
  • Patented snap lock couplings provide easy and dependable joining of the 8 ft. (2.45 m) heavy-duty cable sections with no set screws, nuts or loose pins; all drive connector spirol pins are made of hardened stainless steel.

Share

Print

Brochures and More

Theme picker

Complete Customer Satisfaction

We address all your service concerns with a one year manufacturers warranty on most products including our Pipe Inspection Cameras. We understand your concerns and consult with you to provide that product which will meet your specific operational and budgetary requirements.